Governor Bill Richardson announces that solar manufacturing capacity will come on-stream in New Mexico and some of the production volume is already planned to be sourced by local firm, VLST. …
… “Solar Distinction plans to initially operate a 25-megawatt solar panel manufacturing plant, then expand to 50-megawatts within two years. ” …
Via Yahoo Finance: NM Photovoltaic manufacturing
Solar sourcing arrangement:
Visible Light Solar Technologies Will Source 100% of its Solar Components From the Newly Funded New Mexico Facility (PDF): “Visible Light Solar will be using the panels produced by Solar Distinction as part of its LED lighting fixtures (new or retrofit) with on and off grid energy optimization solutions. ”