Ford’s UK diesel engine plant located in Dagenham, east of London, will receive a third wind turbine. This will be installed on the eastern edge of the production site, as just-auto.com reports.
The turbine has three blades and measures 120m in height. The decision to install it was based on the intention to maintain the plant’s eco energy supply. Planning permission for it was obtained in 2009.
The two other already-installed turbines (one on each side of the estate) are 85m high, and of… (read more)