{"id":144588,"date":"2010-01-06T09:36:25","date_gmt":"2010-01-06T14:36:25","guid":{"rendered":"http:\/\/www.skyscrapercity.com\/showthread.php?t=1039313"},"modified":"2010-01-06T09:36:25","modified_gmt":"2010-01-06T14:36:25","slug":"tyne-renewable-energy-biomass-plant","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/144588","title":{"rendered":"Tyne Renewable Energy (Biomass) Plant"},"content":{"rendered":"<div>Since this topic was getting quite a bit of attention over a number of threads and even in the Teesside forum, i thought i&#8217;d create a dedicated space for us to discuss it.<\/p>\n<p><i>Press Release from MGT Power <\/i>&#8211; <\/p>\n<p>Tyne REP will be one of the worlds largest renewable energy plants, providing enough carbon neutral electricity to power around 600,000 homes (295 MW). As it will operate base-load, it will produce in one year as much green electricity as the largest 1,000MW wind farm projects, and save 1.2 million tonnes of CO2 from being emitted every year.<\/p>\n<p>Tyne REP will bring substantial benefits to the region, representing an investment of over \u00a3500 million; the creation of 600 construction jobs; 150 on-site jobs; 300 &#8211; 400 indirect jobs and an annual spend of \u00a330 million in the local economy. <\/p>\n<p><i>Image<\/i> &#8211;<\/p>\n<p><img decoding=\"async\" src=\"http:\/\/img.photobucket.com\/albums\/v293\/throwaway\/tynemgt.jpg\" border=\"0\" alt=\"\" \/><\/p>\n<p>Extensive list of FAQs provided by the project&#8217;s dedicated website here &#8211; <a href=\"http:\/\/www.mgttyne.com\/faqs.html\" >http:\/\/www.mgttyne.com\/faqs.html<\/a><\/p>\n<p>Some key points &#8211; the chimney stack will reach 95m, while the boiler house will be 55m. The plant will use 2.4m tonnes of clean woodchip per year, and this will be delivered to site from the Americas and the Baltic, arriving at a new dock built alongside the power plant. <\/p>\n<p>For reference, here is a link to MGT&#8217;s Teesside Biomass plant &#8211; <a href=\"http:\/\/www.mgtteesside.com\/\" >http:\/\/www.mgtteesside.com\/<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Since this topic was getting quite a bit of attention over a number of threads and even in the Teesside forum, i thought i&#8217;d create a dedicated space for us to discuss it. Press Release from MGT Power &#8211; Tyne REP will be one of the worlds largest renewable energy plants, providing enough carbon neutral [&hellip;]<\/p>\n","protected":false},"author":1964,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-144588","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/144588","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/1964"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=144588"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/144588\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=144588"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=144588"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=144588"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}