{"id":198490,"date":"2010-01-19T09:13:15","date_gmt":"2010-01-19T14:13:15","guid":{"rendered":"http:\/\/greenenergyreporter.com\/?p=5634"},"modified":"2010-01-19T09:13:15","modified_gmt":"2010-01-19T14:13:15","slug":"ontario%e2%80%99s-21000-megawatts-offshore-potential","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/198490","title":{"rendered":"Ontario\u2019s 21,000 Megawatts Offshore Potential"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.greenenergyreporter.com\/wp-content\/themes\/v1\/img\/cat\/policy.png\" width=\"8\" height=\"8\" alt=\"\" title=\"Policy\" \/><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/www.greenenergyreporter.com\/wp-content\/themes\/v1\/img\/cat\/wind.png\" width=\"8\" height=\"8\" alt=\"\" title=\"Wind\" \/><\/p>\n<p style=\"text-align: center;\"><a href=\"http:\/\/greenenergyreporter.com\/wp-content\/uploads\/2010\/01\/offshore_wind1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-5639\" title=\"offshore_wind1\" src=\"http:\/\/greenenergyreporter.com\/wp-content\/uploads\/2010\/01\/offshore_wind1.jpg\" alt=\"\" width=\"415\" height=\"311\" \/><\/a><\/p>\n<p>A report recently released by renewable energy developer Trillium Power Wind in Toronto highlights that Ontario\u2019s energy regulators have so far received applications for offshore wind projects that combined could generate almost 21,000 megawatts of power.<span id=\"more-5634\"><\/span><\/p>\n<p>Trillium has skin in the game <a href=\"http:\/\/www.trilliumpower.com\/energy\/project-wind-1\/\">with its own plan<\/a> for a 710 megawatts wind farm offshore Lake Ontario.<\/p>\n<p>Quoting the\u00a0report the <a href=\"http:\/\/www.theglobeandmail.com\/report-on-business\/industry-news\/energy-and-resources\/great-lakes-wind-could-power-ontario-report\/article1435455\/\">Globe and Mail<\/a> writes that in Ontario offshore wind could generate more than C$250-billion ($243 billion) of economic activity over 15 years.<\/p>\n<p>On shore or off shore, renewable energy companies\u00a0like Ontario&#8217;s investor- friendly energy legislation. The Green Energy Act,\u00a0<a href=\"http:\/\/feedproxy.google.com\/..\/2009\/02\/ontario-introduces-sweeping-green-energy-reforms\/\">voted into law<\/a> last spring, includes a generous feed-in tariff system that\u00a0sets the price the government will pay for wind or solar power. This allows developers to enter long-term power purchase agreements with provincial utilities knowing in advance what they would earn over the lifetime of the projects.<\/p>\n<p>Specific to off shore power, the Green Energy Act has set a high price of\u00a019 cents a kilowatt-hour, which is more than double the current retail rate, reports the Globe and Mail.<\/p>\n<p>Trillium says the Great Lakes&#8217; mix of high winds, relatively shallow water, and access to existing transmission lines make it an attractive area to develop offshore wind farms. Research firm Emerging Energy Research North America&#8217;s first offshore wind farm won&#8217;t be built until 2012.<\/p>\n<p>The U.S. lags behind in developing its offshore potential. Emblematic of that is Cape Wind, a Boston-based developer, <a href=\"http:\/\/feedproxy.google.com\/..\/2009\/05\/this-week-in-green-energy-taping-the-offshore-winds\/\">which for the past seven years<\/a> plan for a 420 megawatts offshore wind power project off shore Cape Cod has been snarled by opposition from local residents and bureaucratic red tape.<\/p>\n<p>Until a few weeks ago the project, after numerous setbacks, seemed on track to start negotiating terms of a crucial long-term power purchase agreement\u00a0with local utilities. Yet, that&#8217;s been put on hold with the recent decision by the National Register of Historic Places<a href=\"http:\/\/feedproxy.google.com\/..\/2010\/01\/cape-wind-offshore-wind-project-faces-new-permiting-hurdle\/\"> to grant<\/a> the Nantucket Sound eligibility to be listed in the National Register of Historic Places. The decision could lead to more delays as it ensures that significant archeological research are undertaken as part of this already long permitting process.<\/p>\n<pre>Photo Credit: GridServer.com<\/pre>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/feeds.feedburner.com\/~r\/GreenEnergyReporter\/~4\/2286T5c9Vw0\" height=\"1\" width=\"1\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>A report recently released by renewable energy developer Trillium Power Wind in Toronto highlights that Ontario\u2019s energy regulators have so far received applications for offshore wind projects that combined could generate almost 21,000 megawatts of power. Trillium has skin in the game with its own plan for a 710 megawatts wind farm offshore Lake Ontario. [&hellip;]<\/p>\n","protected":false},"author":2814,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-198490","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/198490","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/2814"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=198490"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/198490\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=198490"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=198490"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=198490"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}