{"id":198793,"date":"2010-01-19T12:49:11","date_gmt":"2010-01-19T17:49:11","guid":{"rendered":"http:\/\/www.skyscrapercity.com\/showthread.php?t=1049083"},"modified":"2010-01-19T12:49:11","modified_gmt":"2010-01-19T17:49:11","slug":"how-the-price-tag-doubled-for-the-st-clair-line","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/198793","title":{"rendered":"How the price tag doubled for the St. Clair line"},"content":{"rendered":"<div>\n<div style=\"margin:20px; margin-top:5px; \">\n<div class=\"smallfont\" style=\"margin-bottom:2px\">Quote:<\/div>\n<table cellpadding=\"6\" cellspacing=\"0\" border=\"0\" width=\"100%\">\n<tr>\n<td class=\"alt2\">\n<hr \/>\n<p>\t\t\t\t<b><font size=\"5\">How the price tag doubled for the St. Clair line<\/font><\/p>\n<p>Lack of central oversight, construction add-ons blamed for the cost skyrocketing to $106-million<\/p>\n<p>Kelly Grant<\/p>\n<p>City Hall Bureau Chief \u0097 From Tuesday&#8217;s Globe and Mail Published on Tuesday, Jan. 19, 2010 12:13AM EST Last updated on Tuesday, Jan. 19, 2010 4:20AM EST<\/b><\/p>\n<p>The price tag of the new St. Clair streetcar line nearly doubled because nobody was in charge as the project&#8217;s scope ballooned, public consultation ran amok and <b>more than 20 small contractors tripped over each other.<\/b><\/p>\n<p>That&#8217;s the conclusion of a new study to be presented tomorrow to the TTC&#8217;s board, which is trying to learn from its mistakes as it embarks on a 120-kilometre light-rail expansion modelled on St. Clair&#8217;s exclusive right-of-way.<\/p>\n<p>\u0093It&#8217;s no secret this thing was not the city and the TTC&#8217;s finest hour in the eyes of the public,\u0094 said Richard Soberman, co-author of the report and former chairman of the University of Toronto&#8217;s department of civil engineering.<br \/>\n<b><br \/>\nWhen city council approved the 6.8-kilometre St. Clair line in September, 2004, it predicted the project would cost $48-million.<\/b><\/p>\n<p>The figure was revised to $65-million before construction began.<\/p>\n<p><b>Now, six years later, the final cost is expected to be $106-million and the last 300 metres of the line won&#8217;t open until June.<\/b><\/p>\n<p>Dr. Soberman and co-author Les Kelman found the city and TTC failed to co-ordinate because there was no clear boss.<\/p>\n<p>\u0093Various elements of the project were neither centralized nor controlled by any single entity,\u0094 the report says.<\/p>\n<p><img decoding=\"async\" src=\"http:\/\/i47.tinypic.com\/qohhxz.jpg\" border=\"0\" alt=\"\" \/><\/p>\n<p>The study also criticized the TTC for letting public consultations drag on indefinitely and for allowing \u0093scope creep.\u0094<\/p>\n<p>Once shovels were in the ground, transit upgrades and unrelated jobs such as burying hydro lines piled up, increasing the costs and the construction headaches.<\/p>\n<p>Those headaches linger for some business owners on St. Clair West.<\/p>\n<p>Although construction is finished and streetcars are rolling from Yonge Street to Lansdowne Avenue, shoppers haven&#8217;t returned, said the executive director of the Corso Italia Business Improvement Area.<\/p>\n<p>\u0093It&#8217;s done nothing. It&#8217;s been of little value to the businesses and little value to the residents,\u0094 Jeff Gillan said. His wife owns Carmen&#8217;s Designs, a children&#8217;s clothing shop and one of approximately 250 businesses between Dufferin Street and Lansdowne.<\/p>\n<p>To avoid laying off staff, she hasn&#8217;t taken a paycheque in three months, Mr. Gillan said.<\/p>\n<p>Don&#8217;s Meats, located on the unfinished stretch of the streetcar route west of Lansdowne, hasn&#8217;t suffered as much as some of its neighbours.<\/p>\n<p>That&#8217;s because construction crews ripped up the road outside the shop in small chunks rather than several blocks at a time, mitigating the traffic jams that paralyzed other sections of the St. Clair line, said Don Panos, who has owned a wholesale and retail meat shop in the area for 26 years.<\/p>\n<p>The TTC should apply that construction lesson to its new light-rail routes, Mr. Panos said.<\/p>\n<p>The transit authority also needs to avoid dividing the community, as happened on St. Clair. \u0093They [the TTC and the city] were adamant and forced their will on the people,\u0094 Mr. Panos said.<\/p>\n<p>The councillor who championed St. Clair&#8217;s exclusive right-of-way said many of the problems identified in the report have already been remedied for the first Transit City lines to be built on Eglinton, Sheppard and Finch avenues.<\/p>\n<p>\u0093You need to know where the buck stops,\u0094 said Joe Mihevc, a TTC commissioner whose Ward 21 includes most of St. Clair West. \u0093On Eglinton, Sheppard and Finch, it&#8217;s the TTC that will be in charge. It&#8217;s their puppy.\u0094<\/p>\n<p>The TTC is already looking to replace the mishmash of small contractors that built St. Clair with larger contractors capable of co-ordinating sprawling projects. Teams of communications staff will keep people abreast of Transit City developments; one employee with 16 other projects on his watch handled communications for the St. Clair line, Mr. Mihevc said.<\/p>\n<p>So far, Mark Bozian is cautiously optimistic about the 15-kilometre light-rail line outside his Toyota dealership on Sheppard Avenue East, where he chairs the business improvement area. Pre-construction broke ground last month.<\/p>\n<p>\u0093We want it to be done in a consensual, prudent, businesslike fashion,\u0094 Mr. Bozian said. \u0093If they don&#8217;t, we&#8217;ll end up with the same nightmare as St. Clair.\u0094<\/p>\n<p>Off the Rails<\/p>\n<p>The St. Clair Avenue West streetcar line leapt in cost from its conception to its completion over half a decade. Here is a list of key numbers relating to the project:<\/p>\n<p>    * $48-million initial cost estimate, September 2004<br \/>\n    * $65-million updated cost estimate<br \/>\n    * $106-million estimated final cost<br \/>\n    * 5 the number of years to complete, assuming the full line opens by June 2010<br \/>\n    * 20 the minimum number of small construction contracts awarded for projects relating to the line<br \/>\n    * 8 the number of months a judicial review delayed the project <\/p>\n<p>Source: Getting it Right: Lessons from the Implementation of the St. Clair Streetcar for the Implementation of Transit City.<\/p>\n<hr \/>\n<\/td>\n<\/tr>\n<\/table>\n<\/div>\n<p><a href=\"http:\/\/www.theglobeandmail.com\/news\/national\/toronto\/how-the-price-tag-doubled-for-the-st-clair-line\/article1435758\/\" >http:\/\/www.theglobeandmail.com\/news\/&#8230;rticle1435758\/<\/a><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Quote: How the price tag doubled for the St. Clair line Lack of central oversight, construction add-ons blamed for the cost skyrocketing to $106-million Kelly Grant City Hall Bureau Chief \u0097 From Tuesday&#8217;s Globe and Mail Published on Tuesday, Jan. 19, 2010 12:13AM EST Last updated on Tuesday, Jan. 19, 2010 4:20AM EST The price [&hellip;]<\/p>\n","protected":false},"author":2820,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-198793","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/198793","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/2820"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=198793"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/198793\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=198793"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=198793"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=198793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}