{"id":571443,"date":"2010-05-20T03:00:00","date_gmt":"2010-05-20T07:00:00","guid":{"rendered":"http:\/\/news.directindustry.com\/press\/fibo-intercon\/new-mobile-concrete-batching-plant-can-replace-a-small-concrete-factory-64523-340632.html"},"modified":"2010-05-20T03:00:00","modified_gmt":"2010-05-20T07:00:00","slug":"new-mobile-concrete-batching-plant-can-replace-a-small-concrete-factory","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/571443","title":{"rendered":"New mobile concrete batching plant can replace a small concrete factory"},"content":{"rendered":"<p>60,000 m\u00b2 floor for a new storage hotel on the outskirts of Paris. This was the task faced by fibo<br \/>\nintercon&#8217;s client, whose company is based in Luxemburg. The project, however, was associated with<br \/>\nlogistical difficulties. First and foremost the concrete had to be delivered continuously which<br \/>\naccording to calculations required 10 truck mixers each day to go back and forth between the<br \/>\nconcrete factory and the construction site. Another challenge was the traffic difficulties which<br \/>\nfrequently arise in and around the French capital. Thus, great risk was associated with having a<br \/>\nconcrete factory supply concrete for the project. Therefore fibo intercon&#8217;s customer started looking for<br \/>\nother solutions.<br \/>\nThe solution was found at fibo intercon, a company which manufactures concrete batching<br \/>\nplants, concrete systems and equipment for the global concrete industry. The two companies<br \/>\nhad already for some time discussed the possibility of developing a concrete batching plant that<br \/>\ncould meet the customer&#8217;s requirements and needs. But when the order for the 60,000 m\u00b2 floor<br \/>\nin Paris finally was within reach, the joint project was speeded up.<br \/>\nIn the process the two companies have worked closely together on the technical clarification. All<br \/>\ndetails and options have been discussed thoroughly, and adjustments have been made. In May<br \/>\n2009 the finished batching plant was ready for production at the construction site near the<br \/>\nstorage hotel in Paris.<br \/>\nThe concept<br \/>\nThe newly developed concrete batching is characterized by high mobility and flexibility. The<br \/>\nindividual units are mounted on swap loads with hydraulic legs, making it easy to move<br \/>\nbetween projects. When the batching plant arrives at the construction site, it takes about one<br \/>\nday to erect it. None of the units requires a cast foundation, but can be placed on a level surface.<br \/>\nThis allows the contractor to begin concrete production almost right away.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>60,000 m\u00b2 floor for a new storage hotel on the outskirts of Paris. This was the task faced by fibo intercon&#8217;s client, whose company is based in Luxemburg. The project, however, was associated with logistical difficulties. First and foremost the concrete had to be delivered continuously which according to calculations required 10 truck mixers each [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-571443","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/571443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=571443"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/571443\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=571443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=571443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=571443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}