{"id":577812,"date":"2010-05-25T11:07:40","date_gmt":"2010-05-25T15:07:40","guid":{"rendered":"http:\/\/cleantechnica.com\/?p=10187"},"modified":"2010-05-25T11:07:40","modified_gmt":"2010-05-25T15:07:40","slug":"gamesa-and-cannon-build-one-of-the-largest-wind-farms-in-north-america","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/577812","title":{"rendered":"Gamesa and Cannon Build One of The Largest Wind Farms In North America"},"content":{"rendered":"<p><a href=\"http:\/\/cleantechnica.com\/files\/2010\/05\/Cannon_Washington.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-10191\" title=\"Cannon_Washington\" src=\"http:\/\/go635254.s3.amazonaws.com\/cleantechnica\/files\/2010\/05\/Cannon_Washington.jpg\" alt=\"\" width=\"494\" height=\"332\" \/><\/a><br \/>\nSpanish wind turbine builder <a href=\"http:\/\/www.gamesacorp.com\/es\" >Gamesa<\/a> and San Diego wind farm developer <a href=\"http:\/\/www.cannonpowergroup.com\/\" >Cannon Power Group<\/a> have teamed up to start building a wind farm South of the Border to  supply clean power to a quarter of a million households in both California  and Mexico from 500 MW of power by 2015. <a href=\"http:\/\/www.cannonpowergroup.com\/current-projects\/aubanel-wind-and-solar-project-baja-mexico\/\">Cannon  says the site&#8217;s potential capacity is ultimately 1,000 MW.<\/a><\/p>\n<p>The location&#8217;s wind production peaks when demand for electricity is highest; from  mid-afternoon to early evening. Typically wind production peaks at low demand hours.<\/p>\n<p>Cannon and Gamesa have signed a 10-year exclusivity  agreement and will collaborate on further wind farms that Cannon has  plans to  develop in Baja California (Mexico) with Gamesa supplying some development assistance and the wind turbines. <a href=\"http:\/\/cleantechnica.com\/2010\/05\/25\/gamesa-and-cannon-build-one-of-the-largest-wind-farms-in-north-america\/#more-10187\" class=\"more-link\">(more&#8230;)<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Spanish wind turbine builder Gamesa and San Diego wind farm developer Cannon Power Group have teamed up to start building a wind farm South of the Border to supply clean power to a quarter of a million households in both California and Mexico from 500 MW of power by 2015. Cannon says the site&#8217;s potential [&hellip;]<\/p>\n","protected":false},"author":6398,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-577812","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/577812","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/6398"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=577812"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/577812\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=577812"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=577812"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=577812"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}