{"id":582180,"date":"2010-05-27T16:48:00","date_gmt":"2010-05-27T20:48:00","guid":{"rendered":"http:\/\/www.businessinsider.com\/top-kill-problem-bp-delays-operation-for-six-hours-2010-5"},"modified":"2010-05-27T16:48:00","modified_gmt":"2010-05-27T20:48:00","slug":"top-kill-problem-bp-delays-operation-due-to-too-much-leaking-fluid","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/582180","title":{"rendered":"TOP KILL PROBLEM: BP Delays Operation Due To Too Much Leaking Fluid"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"float_right\" src=\"http:\/\/static.businessinsider.com\/image\/4bfd88907f8b9a0570990200-347-260\/livecam.jpg\" border=\"0\" alt=\"livecam\" width=\"347\" height=\"260\" \/><\/p>\n<p>An anonymous BP technician tells the NYT there&#8217;s been a delay after too much drilling fluid was escaping the well. The mud-like fluid has to be in place before Top Kill moves to the cement phase.<\/p>\n<p><em><a href=\"http:\/\/www.nytimes.com\/2010\/05\/28\/us\/28spill.html\">New York Times<\/a><\/em>:<\/p>\n<p style=\"padding-left: 30px;\">A technician at the BP command center said that pumping of the fluid had  to be stopped temporarily while engineers were revising their plans,  and that the company hoped to resume pumping by midnight, if federal  officials approved.<\/p>\n<p style=\"padding-left: 30px;\">The technician, who spoke on condition of anonymity because he was not  authorized to brief reporters, said the problem was not seen as serious.  &ldquo;We&rsquo;re still quite optimistic,&rdquo; he said, but cautioned: &ldquo;It is not  assured and its not a done deal yet. All of this will require some  time.&rdquo;<\/p>\n<p>It just so happens that BP killed the live cam feed minutes shortly before the news, claiming the camera lens was dirty.<em><\/em><\/p>\n<p><em>Don&#8217;t Miss: <a href=\"http:\/\/www.businessinsider.com\/sickening-photos-of-oil-entering-the-marshes-2010-5#-1\">Nausea-Inducing Pictures Of Oil Entering The Marsh<\/a><\/em><\/p>\n<p><a href=\"http:\/\/www.businessinsider.com\/top-kill-problem-bp-delays-operation-for-six-hours-2010-5#comments\">Join the conversation about this story &#187;<\/a><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/feeds.feedburner.com\/~r\/TheMoneyGame\/~4\/Zlelrz6aYww\" height=\"1\" width=\"1\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An anonymous BP technician tells the NYT there&#8217;s been a delay after too much drilling fluid was escaping the well. The mud-like fluid has to be in place before Top Kill moves to the cement phase. New York Times: A technician at the BP command center said that pumping of the fluid had to be [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-582180","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/582180","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=582180"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/582180\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=582180"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=582180"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=582180"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}