{"id":639827,"date":"2012-11-22T17:00:02","date_gmt":"2012-11-22T22:00:02","guid":{"rendered":"http:\/\/serkadis.com\/index\/?guid=73418ad637009f2fd54efb5d9a972083"},"modified":"2012-11-22T17:00:02","modified_gmt":"2012-11-22T22:00:02","slug":"tcrp-legal-research-digest-39-competition-requirements-of-the-designbuild-construction-manager-at-risk-and-public-private-partnership-contractsmdashseven-case-studies","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/639827","title":{"rendered":"TCRP Legal Research Digest 39: Competition Requirements of the Design\/Build, Construction Manager at Risk, and Public-Private Partnership Contracts&amp;mdash;Seven Case Studies"},"content":{"rendered":"<p><a href=\"http:\/\/www.nap.edu\/catalog.php?record_id=14639\"><img decoding=\"async\" src=\"http:\/\/images.nap.edu\/images\/tinycov\/0309277787.gif\" alt=\"Cover image\" hspace=\"10\" vspace=\"0\" border=\"1\" align=\"left\"><\/a>TRB\\&#8217;s Transit Cooperative Research Program (TCRP) Legal Research Digest 39: Competition Requirements of the Design\/Build, Construction Manager at Risk, and Public-Private Partnership Contracts&mdash;Seven Case Studies explores the use of various project delivery methods, including design-build, construction management at risk, and a number of options considered public-private partnerships, through the examination of seven separate construction projects in various parts of the United States. <\/p>\n<p> The examinations of the seven selected projects are designed to show how particular, and often unique, problems were addressed in each project by utilizing a wide variety of procurement and delivery methods.<img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/feeds.feedburner.com\/~r\/nap\/new\/~4\/sf8EKVjE0EM\" height=\"1\" width=\"1\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>TRB\\&#8217;s Transit Cooperative Research Program (TCRP) Legal Research Digest 39: Competition Requirements of the Design\/Build, Construction Manager at Risk, and Public-Private Partnership Contracts&mdash;Seven Case Studies explores the use of various project delivery methods, including design-build, construction management at risk, and a number of options considered public-private partnerships, through the examination of seven separate construction projects [&hellip;]<\/p>\n","protected":false},"author":7360,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-639827","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/639827","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/7360"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=639827"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/639827\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=639827"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=639827"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=639827"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}