{"id":640301,"date":"2013-01-28T11:37:14","date_gmt":"2013-01-28T16:37:14","guid":{"rendered":"http:\/\/gigaom.com\/?p=604931"},"modified":"2013-01-28T11:37:14","modified_gmt":"2013-01-28T16:37:14","slug":"audit-reveals-some-mismanagement-of-smart-grid-demonstration-stimulus-funds","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/640301","title":{"rendered":"Audit reveals some mismanagement of smart grid demonstration stimulus funds"},"content":{"rendered":"<p><a href=\"http:\/\/gigaom.com\/2009\/10\/27\/smart-grid-stimulus-funding-revealed\/\">Over three years ago<\/a> the Department of Energy allocated around $4.5 billion in stimulus funds for smart grid projects in the U.S. That included $700 million for demonstration projects that helped install technology like wireless data networks and battery farms for the power grid. With such a large amount handed out over a relatively short period of time, the chances of problems were high. And according to a newly released <a href=\"http:\/\/energy.gov\/ig\/downloads\/department-energys-700-million-smart-grid-demonstration-program-funded-through-american\">report from the Department of Energy&#8217;s Inspector General<\/a>, the smart grid demonstration program had some management issues.<\/p>\n<p>Those problems included:<\/p>\n<ol>\n<li>Handing out funds for a couple projects for estimated costs instead of actual costs of projects, which resulted in over payments.<\/li>\n<li>Funding a project that also received a grant from another DOE program, the ARPA-E program, for the exact same project.<\/li>\n<li>Funding a project that had not handed in proper documents, and had not begun making the energy storage units that it claimed for the award.<\/li>\n<\/ol>\n<p>The audit looked at just 11 projects, with a total of $279 million in awards, out of the $700 million smart grid demonstration program. Out of that section alone they found $12.3 million in questioned costs, and they have now recovered $6.6 million of those misspent costs, and plan to recover another $5 million. It&#8217;s probably safe to assume there&#8217;s similar levels of mismanagement throughout the entire $4.5 billion.<\/p>\n<p>The report says:<\/p>\n<blockquote id=\"quote-the-department-had-n\">\n<p>The Department had not always managed the Program effectively and efficiently. . . .In the absence of significant improvements, the Program is at risk of not meeting its objectives and has an increased risk of fraud, waste and abuse.<\/p>\n<\/blockquote>\n<p>As a result the report recommends that the program:<\/p>\n<ul>\n<li>Ensure adequate review of payments made to recipients<\/li>\n<li>Provide training to recipients on proper submission of reimbursement packages<\/li>\n<li>Ensure that recipients contribute their required cost-share from allowable sources<\/li>\n<li>Ensure the elimination of any potential overlapping funding among awards authorized by various Department programs<\/li>\n<li>Contracting officers should resolve the questioned amounts in our report.<\/li>\n<\/ul>\n<p>The stimulus funds delivered an unprecedented, and game-changing amount of federal support for the next generation of power grid technology. It&#8217;s natural that with such a large amount of money allocated that mismanagement would happen.<\/p>\n<p>One of the things not addressed in the report is how effective &#8212; or not &#8212; this type of stimulus program for smart grid projects actually was. Many in the industry back in 2010 complained that the funds actually had a sort of chilling effect on the sector, because the funds took awhile to actually get delivered, which meant utilities waited on these projects and didn&#8217;t put money into other new ones.<\/p>\n<p> <img loading=\"lazy\" decoding=\"async\" alt=\"\" border=\"0\" src=\"http:\/\/stats.wordpress.com\/b.gif?host=gigaom.com&#038;blog=14960843&#038;%23038;post=604931&#038;%23038;subd=gigaom2&#038;%23038;ref=&#038;%23038;feed=1\" width=\"1\" height=\"1\" \/><\/p>\n<p><a href=\"http:\/\/pubads.g.doubleclick.net\/gampad\/jump?iu=\/1008864\/GigaOM_RSS_300x250&#038;sz=300x250&#038;%23038;c=542362\"><img decoding=\"async\" src=\"http:\/\/pubads.g.doubleclick.net\/gampad\/ad?iu=\/1008864\/GigaOM_RSS_300x250&#038;sz=300x250&#038;%23038;c=542362\" \/><\/a><\/p>\n<p><img width='1' height='1' src='http:\/\/gigaom.feedsportal.com\/c\/34996\/f\/646446\/s\/27fb168d\/mf.gif' border='0'\/><\/p>\n<div class='mf-viral'>\n<table border='0'>\n<tr>\n<td valign='middle'><a href=\"http:\/\/share.feedsportal.com\/viral\/sendEmail.cfm?lang=en&#038;title=Audit+reveals+some+mismanagement+of+smart+grid+demonstration+stimulus+funds&#038;link=http%3A%2F%2Fgigaom.com%2F2013%2F01%2F28%2Faudit-reveals-some-mismanagment-of-smart-grid-demonstration-stimulus-funds%2F\" ><img decoding=\"async\" src=\"http:\/\/res3.feedsportal.com\/images\/emailthis2.gif\" border=\"0\" \/><\/a><\/td>\n<td valign='middle'><a href=\"http:\/\/res.feedsportal.com\/viral\/bookmark.cfm?title=Audit+reveals+some+mismanagement+of+smart+grid+demonstration+stimulus+funds&#038;link=http%3A%2F%2Fgigaom.com%2F2013%2F01%2F28%2Faudit-reveals-some-mismanagment-of-smart-grid-demonstration-stimulus-funds%2F\" ><img decoding=\"async\" src=\"http:\/\/res3.feedsportal.com\/images\/bookmark.gif\" border=\"0\" \/><\/a><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<p><a href=\"http:\/\/da.feedsportal.com\/r\/151884911682\/u\/49\/f\/646446\/c\/34996\/s\/27fb168d\/a2.htm\"><img decoding=\"async\" src=\"http:\/\/da.feedsportal.com\/r\/151884911682\/u\/49\/f\/646446\/c\/34996\/s\/27fb168d\/a2.img\" border=\"0\"\/><\/a><img loading=\"lazy\" decoding=\"async\" width=\"1\" height=\"1\" src=\"http:\/\/pi.feedsportal.com\/r\/151884911682\/u\/49\/f\/646446\/c\/34996\/s\/27fb168d\/a2t.img\" border=\"0\"\/><\/p>\n<div class=\"feedflare\">\n<a href=\"http:\/\/feeds.feedburner.com\/~ff\/OmMalik?a=HOF8c1pOx3A:rIjAZNx8hpI:yIl2AUoC8zA\"><img decoding=\"async\" src=\"http:\/\/feeds.feedburner.com\/~ff\/OmMalik?d=yIl2AUoC8zA\" border=\"0\"><\/img><\/a>\n<\/div>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/feeds.feedburner.com\/~r\/OmMalik\/~4\/HOF8c1pOx3A\" height=\"1\" width=\"1\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Over three years ago the Department of Energy allocated around $4.5 billion in stimulus funds for smart grid projects in the U.S. That included $700 million for demonstration projects that helped install technology like wireless data networks and battery farms for the power grid. With such a large amount handed out over a relatively short [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-640301","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/640301","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=640301"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/640301\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=640301"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=640301"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=640301"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}