{"id":657442,"date":"2013-05-10T21:40:32","date_gmt":"2013-05-11T01:40:32","guid":{"rendered":"http:\/\/gigaom.com\/?p=644364"},"modified":"2013-05-10T21:40:32","modified_gmt":"2013-05-11T01:40:32","slug":"twitter-reportedly-plans-to-expand-sacramento-data-center-space","status":"publish","type":"post","link":"https:\/\/mereja.media\/index\/657442","title":{"rendered":"Twitter reportedly plans to expand Sacramento data center space"},"content":{"rendered":"<p>Twitter is leasing more data center space at RagingWire&#8217;s <a href=\"http:\/\/www.ragingwire.com\/california-data-center-campus\/overview\">500,000-square-foot campus<\/a> in Sacramento, Data Center Knowledge <a href=\"http:\/\/www.datacenterknowledge.com\/archives\/2013\/05\/10\/twitter-plans-huge-data-center-expansion\/\">reported<\/a> Friday, attributing its report to &#8220;industry sources.&#8221; There&#8217;s no square-footage figure available, but power use for the expansion is pegged at &#8220;more than 20 megawatts.&#8221; And so the mystery about Twitter&#8217;s infrastructure continues.<\/p>\n<p>The reported expansion comes on top of Twitter&#8217;s existing infrastructure footprint, which apparently includes space at the Sacramento facility and might also include space at the data center <a href=\"http:\/\/gigaom.com\/2010\/07\/21\/twitter-to-build-data-center-to-beach-the-fail-whale\/\">custom-built for Twitter<\/a>, which the company <a href=\"http:\/\/gigaom.com\/2011\/03\/21\/twitter-moves-into-data-center-goodbye-fail-whale\/\">moved into<\/a> in 2011. At that time, former Twitter vice president of engineering Michael Abbott wrote that the social network had arrived at its <a href=\"http:\/\/gigaom.com\/2011\/03\/21\/twitter-moves-into-data-center-goodbye-fail-whale\/\">&#8220;final nesting ground.&#8221;<\/a> But it seems that nesting ground was not big enough.<\/p>\n<p>Like Facebook, Twitter is not a site for flat traffic. The infrastructure needs to accommodate traffic spikes &#8212; think of how people <a href=\"http:\/\/gigaom.com\/2012\/10\/30\/hurricane-sandy-and-twitter-as-a-self-cleaning-oven-for-news\/\">clung to Twitter<\/a> during Hurricane Sandy &#8212; and having more space can keep Twitter ahead in those types of situations.<\/p>\n<p>Keeping latency low as monthly active user count increases &#8212; it was at <a href=\"http:\/\/gigaom.com\/2013\/02\/04\/how-social-media-is-becoming-as-important-a-live-event-as-the-live-event-itself\/\">more than 200 million<\/a> in December, up from 100 million in September 2011 &#8212; is likely a high priority, too.<\/p>\n<p>More data center space also makes for better backup capability. Remember when Sandy proved the importance of being ready for disasters with <a href=\"http:\/\/gigaom.com\/2012\/10\/31\/how-good-prep-and-a-bucket-brigade-kept-peer-1-online-during-hurricane-sandy\/\">flooding and power outages<\/a> on the East Coast? A bigger footprint for Twitter translates into lower likelihood of a fail whale.<\/p>\n<p>Twitter&#8217;s infrastructure expansion comes following news of other webscale players bumping up their respective footprints. Facebook reportedly <a href=\"http:\/\/gigaom.com\/2013\/04\/22\/data-centers-are-getting-more-sophisticated-so-why-arent-our-metrics-keeping-up\/\">will build<\/a> a new data center in Altoona, Iowa, with the <a href=\"http:\/\/gigaom.com\/2013\/04\/23\/data-center-rivals-facebook-and-google-pump-700m-in-new-construction-into-iowa\/\">first phase<\/a> measuring 476,000 square feet and costing $300 million. Also in Iowa, Google <a href=\"http:\/\/gigaom.com\/2013\/04\/23\/data-center-rivals-facebook-and-google-pump-700m-in-new-construction-into-iowa\/\">said<\/a> it would expand its data center in the city of Council Bluffs, and Data Center Knowledge <a href=\"http:\/\/www.datacenterknowledge.com\/archives\/2013\/04\/22\/linkedin-adds-data-center-space-in-northern-virginia\/\">reported<\/a> last month that LinkedIn is expanding its data center space, too.<\/p>\n<p>Twitter did not respond to a request for comment. <\/p>\n<p>The company is <a href=\"http:\/\/gigaom.com\/2012\/08\/22\/the-clarity-and-mystery-behind-what-makes-twitter-run\/\">worthy of merit<\/a> for talking about its features in public and open-sourcing many of them, although it <a href=\"http:\/\/gigaom.com\/2012\/07\/26\/why-twitter-should-open-up-about-its-infrastructure\/\">has been cagey<\/a> about disclosing information about its infrastructure and the causes of <a href=\"http:\/\/status.twitter.com\/\">service disruptions<\/a>. We know very little about Twitter&#8217;s infrastructure, in contrast to <a href=\"http:\/\/gigaom.com\/2011\/04\/07\/how-facebook-changed-technology-in-one-day\/\">Facebook<\/a> and <a href=\"http:\/\/gigaom.com\/2012\/03\/26\/whose-data-centers-are-more-efficient-facebooks-or-googles\/\">Google&#8217;s<\/a> installations. In the past <a href=\"http:\/\/gigaom.com\/2011\/06\/24\/twitters-data-center-mystery-deepens\/\">it was unclear<\/a> where the custom-built data center was, as the plan in 2010 was for the Salt Lake City area, but then it was reported that Twitter was actually moving servers to Sacramento. Twitter&#8217;s status in <a href=\"http:\/\/gigaom.com\/2011\/09\/19\/twitters-ever-changing-infrastructure-story\/\">Atlanta<\/a> is another unsolved mystery.<\/p>\n<p> <img loading=\"lazy\" decoding=\"async\" alt=\"\" border=\"0\" src=\"http:\/\/stats.wordpress.com\/b.gif?host=gigaom.com&#038;blog=14960843&#038;%23038;post=644364&#038;%23038;subd=gigaom2&#038;%23038;ref=&#038;%23038;feed=1\" width=\"1\" height=\"1\" \/><\/p>\n<p><a href=\"http:\/\/pubads.g.doubleclick.net\/gampad\/jump?iu=\/1008864\/GigaOM_RSS_300x250&#038;sz=300x250&#038;%23038;c=247017\"><img decoding=\"async\" src=\"http:\/\/pubads.g.doubleclick.net\/gampad\/ad?iu=\/1008864\/GigaOM_RSS_300x250&#038;sz=300x250&#038;%23038;c=247017\" \/><\/a><\/p>\n<p><strong>Related research and analysis from GigaOM Pro:<\/strong><br \/>Subscriber content. <a href=\"http:\/\/pro.gigaom.com\/?utm_source=cloud&#038;utm_medium=editorial&#038;utm_campaign=auto3&#038;utm_term=644364+twitter-reportedly-plans-to-expand-sacramento-data-center-space&#038;utm_content=gigajordan\">Sign up for a free trial<\/a>.<\/p>\n<ul>\n<li><a href=\"http:\/\/pro.gigaom.com\/2012\/03\/a-near-term-outlook-for-big-data\/?utm_source=cloud&#038;utm_medium=editorial&#038;utm_campaign=auto3&#038;utm_term=644364+twitter-reportedly-plans-to-expand-sacramento-data-center-space&#038;utm_content=gigajordan\">A near-term outlook for big data<\/a><\/li>\n<li><a href=\"http:\/\/pro.gigaom.com\/2011\/11\/dissecting-the-data-5-issues-for-our-digital-future\/?utm_source=cloud&#038;utm_medium=editorial&#038;utm_campaign=auto3&#038;utm_term=644364+twitter-reportedly-plans-to-expand-sacramento-data-center-space&#038;utm_content=gigajordan\">Dissecting the data: 5 issues for our digital future<\/a><\/li>\n<li><a href=\"http:\/\/pro.gigaom.com\/2011\/07\/newnet-q2-google-closes-the-quarter-with-a-bang\/?utm_source=cloud&#038;utm_medium=editorial&#038;utm_campaign=auto3&#038;utm_term=644364+twitter-reportedly-plans-to-expand-sacramento-data-center-space&#038;utm_content=gigajordan\">NewNet Q2: Google closes the quarter with a bang<\/a><\/li>\n<\/ul>\n<p><img width='1' height='1' src='http:\/\/gigaom.feedsportal.com\/c\/34996\/f\/646446\/s\/2bc52435\/mf.gif' border='0'\/><\/p>\n<div class='mf-viral'>\n<table border='0'>\n<tr>\n<td valign='middle'><a href=\"http:\/\/share.feedsportal.com\/share\/twitter\/?u=http%3A%2F%2Fgigaom.com%2F2013%2F05%2F10%2Ftwitter-reportedly-plans-to-expand-sacramento-data-center-space%2F&#038;t=Twitter+reportedly+plans+to+expand+Sacramento+data+center+space\" ><img decoding=\"async\" src=\"http:\/\/res3.feedsportal.com\/social\/twitter.png\" border=\"0\" \/><\/a>&nbsp;<a href=\"http:\/\/share.feedsportal.com\/share\/facebook\/?u=http%3A%2F%2Fgigaom.com%2F2013%2F05%2F10%2Ftwitter-reportedly-plans-to-expand-sacramento-data-center-space%2F&#038;t=Twitter+reportedly+plans+to+expand+Sacramento+data+center+space\" ><img decoding=\"async\" src=\"http:\/\/res3.feedsportal.com\/social\/facebook.png\" border=\"0\" \/><\/a>&nbsp;<a href=\"http:\/\/share.feedsportal.com\/share\/linkedin\/?u=http%3A%2F%2Fgigaom.com%2F2013%2F05%2F10%2Ftwitter-reportedly-plans-to-expand-sacramento-data-center-space%2F&#038;t=Twitter+reportedly+plans+to+expand+Sacramento+data+center+space\" ><img decoding=\"async\" src=\"http:\/\/res3.feedsportal.com\/social\/linkedin.png\" border=\"0\" \/><\/a>&nbsp;<a href=\"http:\/\/share.feedsportal.com\/share\/gplus\/?u=http%3A%2F%2Fgigaom.com%2F2013%2F05%2F10%2Ftwitter-reportedly-plans-to-expand-sacramento-data-center-space%2F&#038;t=Twitter+reportedly+plans+to+expand+Sacramento+data+center+space\" ><img decoding=\"async\" src=\"http:\/\/res3.feedsportal.com\/social\/googleplus.png\" border=\"0\" \/><\/a>&nbsp;<a href=\"http:\/\/share.feedsportal.com\/share\/email\/?u=http%3A%2F%2Fgigaom.com%2F2013%2F05%2F10%2Ftwitter-reportedly-plans-to-expand-sacramento-data-center-space%2F&#038;t=Twitter+reportedly+plans+to+expand+Sacramento+data+center+space\" ><img decoding=\"async\" src=\"http:\/\/res3.feedsportal.com\/social\/email.png\" border=\"0\" \/><\/a><\/td>\n<td valign='middle'><\/td>\n<\/tr>\n<\/table>\n<\/div>\n<p><a href=\"http:\/\/da.feedsportal.com\/r\/165663946313\/u\/49\/f\/646446\/c\/34996\/s\/2bc52435\/a2.htm\"><img decoding=\"async\" src=\"http:\/\/da.feedsportal.com\/r\/165663946313\/u\/49\/f\/646446\/c\/34996\/s\/2bc52435\/a2.img\" border=\"0\"\/><\/a><img loading=\"lazy\" decoding=\"async\" width=\"1\" height=\"1\" src=\"http:\/\/pi.feedsportal.com\/r\/165663946313\/u\/49\/f\/646446\/c\/34996\/s\/2bc52435\/a2t.img\" border=\"0\"\/><\/p>\n<div class=\"feedflare\">\n<a href=\"http:\/\/feeds.feedburner.com\/~ff\/OmMalik?a=vhi49lBvkJQ:klx_cQOlHjA:yIl2AUoC8zA\"><img decoding=\"async\" src=\"http:\/\/feeds.feedburner.com\/~ff\/OmMalik?d=yIl2AUoC8zA\" border=\"0\"><\/img><\/a>\n<\/div>\n<p><img loading=\"lazy\" decoding=\"async\" src=\"http:\/\/feeds.feedburner.com\/~r\/OmMalik\/~4\/vhi49lBvkJQ\" height=\"1\" width=\"1\"\/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Twitter is leasing more data center space at RagingWire&#8217;s 500,000-square-foot campus in Sacramento, Data Center Knowledge reported Friday, attributing its report to &#8220;industry sources.&#8221; There&#8217;s no square-footage figure available, but power use for the expansion is pegged at &#8220;more than 20 megawatts.&#8221; And so the mystery about Twitter&#8217;s infrastructure continues. The reported expansion comes on [&hellip;]<\/p>\n","protected":false},"author":7463,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[],"class_list":["post-657442","post","type-post","status-publish","format-standard","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/657442","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/users\/7463"}],"replies":[{"embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/comments?post=657442"}],"version-history":[{"count":0,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/posts\/657442\/revisions"}],"wp:attachment":[{"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/media?parent=657442"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/categories?post=657442"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mereja.media\/index\/wp-json\/wp\/v2\/tags?post=657442"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}